BYU Engineering Building
Sunroc was contracted to compete all site demolition, mass excavation, structural excavation and backfill. The utility scope for this project consisted installing storm drains, culinary water, chilled water and sewer lines. Additionally Sunroc excavated the site structure, completed the preparation for concrete, road base and asphalt.