The South Davis Upgrades Project was a “Design/Build” project, which comprised of a total rebuild of Interstate 15 through Davis County, Utah – a very busy commuter section in the greater Salt Lake City area. Additional lanes were added in both directions.

DDF was hired by the design/build team to drive piles for (4) complete bridge replacements and (1) new pedestrian over crossing, all while maintaining all traffic lanes during daylight hours. Much of the work was accomplished during the night (in off peak hours). Over 18,500 LF of 12” and 16” pipe piles were driven, in depths up to 115 feet.