Driven pipe-piles for support of a new pedestrian bridge on the Jordan River Parkway, making a safe pedestrian connection over several RR tracks and through Rocky Mountain Power and Dominion Energy facilities.
Careful coordination with the power company was required while working in close proximity to multiple high voltage power lines.
Furnish & Install 12” Pipe Piles