Southern Parkway – Washington Dam Road To 4300 W. (1308)
Owner: UDOT
General Contractor: WW Clyde – Randy Lingwall
Year: June 2013
Piles on this project were driven into bedrock, with finished lengths from 78 to 102 feet, for support of a bridge on an entirely new roadway in Washington County, Utah. Driven piles were furnished and approx. 1,342 LF HP14x102 piles were installed.