Dominion Energy Pipeline
Dominion Energy Pipeline from Duchesne to Roosevelt, Utah. It will run from approximately 9600 S 4500 W (also known as South Myton Road) in Myton, Utah, to 1500 Eastin in Ballad, Utah. It will also run north along Highway 40 and turn east on Lagoon Street in Roosevelt, Utah.
Canyon Pipeline is serving as the General Contractor on the project which consists of 46,000 cubic yards of flow fill and sand slurry in a short amount of time. Multiple crews worked simultaneously at various locations to quickly finish the project. Older pipes will be replaced with modern, newer, and stronger ones. When completed, the project will help provide safe, reliable natural gas transportation services at the lowest possible costs.