Jackson Airport – Apron Reconstruction
Work includes the removal of existing pavement, Portland Cement concrete paving (13-inch) 9,500 SY, Portland Cement concrete paving (8-inch) 6,000 SY, bituminous paving 1,200 TN, aggregate base course 3,000 CY, unclassified excavation 7,800 CY, storm drain pipe installation (RCP & Ductile Iron) 2,700 LF, 12-inch modular trench drain 340 LF, a modular subsurface stormwater retention system and airfield lighting and pavement marking improvements.